August 2012

The house is designed by us and changes occur frequently. Last night we talked about relocating the rooms where plumbing is needed to be along the edge closest to the well and septic system. The county guys want a map of all those kind of pipes in the house, as well as a map of interior and exterior electric stuff. This is really about the max interference we should see from the county controllers (engineer, Boards of This and That). 2 good reasons to chose this county rather than any other in Colorado. Did I say it’s going to be a round house? 32′ diameter. yep.

And it better become his obsession. (I am just a house-builder Helper.) We’re gonna need some cheap labor (think high school kids)! The lease on this little rental house (where we currently live) ends 9-30-2012. We better get moved in and set up just in time for the big event, right?

Posted in Tranquility Base

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

Weather forecast by WP Wunderground & Denver Snow Plowing